Sureway Construction Group of Companies: Sureway Construction Yellowhead Aggregates Sil Industrial Minerals Sil Coatings Sureway Trucking Stone Creek
BA Energy Heartland Upgrade
Project Title: BA ENERGY HEARTLAND UPGRADER
Service Type: Industrial Construction
Location: Fort Saskatchewan, Alberta
Client Contact: BA Energy, Calgary, Alberta
Work Scope: Site Stripping, Site Grading, Cooling Water Pond Construction, Fabrication and Installation Under a Continuous Dewatering Operation of a 5.7km long Fire Water System and a 1.4km long Oily Water Sewer System, Fabrication and Installation of a 700m Stainless Steel Waste Disposal Line, Construction of 4 Tank Pads complete with Liner and Cathodic Protection Grid, Site Gravel Road Construction, Installation of Perimeter Fencing
Contract Value: Lump Sum/Unit Price Combination - $41.2 million
Comments: Work was continuous through all seasons.

Due to a high water table throughout the site, the installation and continuous operation of a well point dewatering system was required for the duration of the installation of the firewater and oily water sewer system.